13 SERVICES · 4 SCOPES · 300 / 450 / 600
Thirteen services, grouped into four scopes of work. Each one begins the same way — a measured survey of the room you already have, then a drawing that decides where every millimetre goes. Demolition is the sixth stage here, never the first.
6 FACTS · 1 ROOM · CEILING 2340
Scope is chosen from facts, not adjectives. Six pieces of information tell us more about your kitchen than any inspiration folder, and they cost nothing to gather before you get in touch.
4 BANDS · 150 · 300 / 450 / 600 · 900
Four bands of work, read left to right in the order they actually happen on site: strip-out, cabinetry, services and surfaces, then finishing. The stepped column widths below mirror standard cabinet modules, so the widest band carries the most coordination.
150
Floors and doorways protected. Appliances and services isolated. Old cabinetry and benchtops removed in one controlled pass. Substrate checked before anything new is ordered.
300 / 450 / 600
900 · 1200
13
Fit-off, adjustment, silicone, clean and handover.
SCOPE 01 · WHOLE ROOMS
The difference between a rebuild and a refresh is how far back you strip. If the layout works and the carcasses are sound, replacing fronts, benchtops and the splashback changes the room without touching services. If the plan itself is the problem, it is cheaper in the long run to start from the measured drawing.
SCOPE 02 · DRAWING BEFORE BUILDING
A layout is decided by clearances, not by taste: the walking space between a bench and an island, the arc of an open dishwasher door, the reach between cooktop, sink and fridge. Once those are fixed, cabinetry is drawn module by module — which bay takes drawers, which takes pull-outs, where the bin goes, how the appliance tower meets the ceiling.
SCOPE 03 · 20mm · 40mm · FULL HEIGHT
These three decisions carry most of the visible character of a kitchen, and they are made together — a benchtop edge sets the splashback junction, and an island’s overhang sets the seating. Each is templated to what is actually installed, never to the original plan.
SCOPE 04 · FIT-OFF & ADJACENT JOINERY
13 STAGES · ONE SEQUENCE
Consultation · Measure · Design · Quote · Materials · Demolition · Cabinetry · Plumbing and electrical · Benchtops · Splashback · Installation · Finishing · Handover.
PREPARATION · KITCHEN GUIDES
NEXT STAGE · 01 CONSULTATION
Send through your dimensions, what is staying and what is frustrating you, and we will come back with the scope of work that fits — full renovation, cabinetry only, or a surface refresh.