0413 142 055 · 9:00–18:00 daily
08 — PLASTERING & PAINTING
Once old cabinets, tiles or a splashback come off, the wall behind them rarely matches the rest of the room. Ivan Bodnar treats plasterboard, plastering repairs and painting as part of a kitchen renovation in Oakleigh. He checks the surface first and finishes it after that.
CHECK 01 — WHAT IT COVERS
These jobs are related work. On this site they support the main focus: Kitchen Renovations in Oakleigh.
A
New plasterboard can be the practical choice when a wall section is damaged, has been opened up for services, or can’t take a sound finish. Before anything is replaced, Ivan checks the framing and fixing points the board will sit on.
B
Taking out cabinets, tiles or a rangehood can leave fixing holes, torn paper facing, adhesive residue and uneven patches. These are repaired so the wall is ready for paint or a new splashback.
C
This covers walls, ceilings, trims and doors around the kitchen, plus exterior painting as a related job. Paint goes on only after surface preparation, and Ivan chooses suitable materials for the surface and the room.
CHECK 02 — BEFORE THE FINISH
If a wall is painted over moisture, unsound board or a patch that hasn’t been properly prepared, the problem tends to come back through the new coat. You could end up doing the work twice. That is why the order of the checks matters as much as the colour.
01 Look for moisture. Staining, swelling or soft board near the sink, dishwasher or external walls.
02 Check the substrate. Whether the existing plaster or board can be repaired or needs replacing.
03 Confirm service access. Any plumbing or electrical changes behind the wall are done by licensed trades before the wall is closed.
04 Repair and prepare. Fill, set, sand and seal so the surface is even and ready to take the finish.
05 Finish. Apply a paint system suited to the surface, the room and how it is used.
More on this in Surface Preparation and Suitable Materials.
CHECK 03 — SEQUENCE
Wall repairs and painting usually fit around the rest of the kitchen. Licensed trades alter the services first, then the walls are repaired, the cabinetry and splashback go in, and the final paint goes on last. The right order for your kitchen depends on the property and the agreed scope.
Oakleigh has a mix of established houses, interwar and post-war homes, flats and villa units. Wall construction, existing services and any shared-property conditions can differ from one home to the next. Ivan confirms them at the on-site assessment and sets out the scope in a written quotation.
Protected surfaces and taped walls during a kitchen renovation
CHECK 04 — SCOPE
Ivan Bodnar is an independent sole trader. He works within his lawful scope and does not claim unverified trade licences or builder registration. Licensed plumbing and electrical work in the wall is carried out by appropriately authorised specialists, and Ivan coordinates them. He does not carry out structural engineering or asbestos removal. If either is needed, the right specialist has to be involved first.
An inspection can’t reveal everything hidden behind a wall. Project scope, permits, registration, insurance and licensed trade requirements vary, and they are confirmed for each project. For more detail, see Licensed Trades and Regulated Work.